What’s lkprototype’s process for design modifications?

The design change process of lkprototype embraces digital collaboration and quick iteration as the spirit to obtain full-link control and management from requirement analysis to mass production optimization. For example, consumer electronics projects, after the customer initiates a design change request, lkprototype’s AI audit system (AI accuracy 99.5%) can finish the feasibility check in 2 hours (24 hours for conventional process), and automatically split the modification task to 8 departments such as structure, electronics and mold by its web-based collaborative platform. Task assignment error rate ≤0.3%. Based on the statistics of a smartwatch project in 2023, lkprototype finished the iteration of the 3D model within 72 hours (the initial design cycle was 7 days) after getting the demand for screen ratio adjustment, and the cost decreased by 35% compared to the traditional mode.

Pioneering efficiency in demand transformation and simulation verification stage. lkprototype’s CAE simulation system (200TFLOPS) supports parallel computation, reducing the time of a single structural strength analysis from 8 hours to 45 minutes, and generating topology optimization recommendations with 98% accuracy. For example, during the weight-saving requirement of a new energy auto car battery pack shell, there were 15 times of FEA simulation iteration (with normal methods requiring 5 times), and the final plan saved weight by 22% (15% industry average), and modal frequency deviation was controlled at ±2Hz (ISO 16750 standard). Its DFM (Design Manufacturability) analysis tool can identify 0.05mm mold interference risk, and a medical device housing project in 2022 reduced $120,000 in mold rework cost through real-time adjustment.

Prototyping and test validation revolutionize the traditional process. lkprototype’s 3D printing factory is equipped with 60 industrial grade machines (accuracy ±0.05mm), with 24 hours uninterrupted production capability, Nylon glass fiber printing speed of 25cm³/h (industry average 18cm³/h). In a UAV propeller aerodynamic optimization project, lkprototype completed 5 generation prototype iterations within 48 hours (industry 2 weeks), wind tunnel test data and simulation results correlation was 0.97 (industry 0.85), and the ultimate lift coefficient was improved by 12%. Its automatic test line (500 piece/hour capacity) can simulate extreme conditions from -40 ° C to 85 ° C, and the fault detection rate is 99.8% (95% manual detection).

Supply chain coordination and mass production capability are superb. lkprototype’s BOM management cloud system covers 2,000+ global suppliers and real-time updates material alternatives (price variation alarm threshold ±5%). In a chip shortage TWS headset project, lkprototype completed compatible ics matching (pin match 100%) in 4 hours using the alternative library, reduced procurement time from 6 weeks to 10 days, and increased cost by only 3% (industry average 15%). Its mold changing division supports 0.005mm mold changing (EDM precision ±0.002mm), and in 2023 mass production of a smart home gadget, the yield rate was optimized from 82% to 98% with mold flow analysis and optimization, saving material waste cost of $280,000.

Data close loop and knowledge precipitation contribute to long-term value. lkprototype’s PLM system captures 150,000 + project data, and the AI model can reduce the design time of repeat projects by 40% with learning from previous cases. In ergonomic design optimization of a power tool handle, the system automatically activated 8 previous schemes, and the ergonomic rating increased from 6.2 to 8.7 (NASA-TLX standard), and 35% less user fatigue. Its blockchain storage technology enables design iterations to be traced back, and in a 2022 multinational patent dispute case, lkprototype’s time-stamped evidence chain successfully stopped customers from losing $23 million.

Market facts confirm performance: lkprototype’s design modification service average response time is 4.2 hours (24 hours for the industry), customer repeat cooperation rate is 89%, and project on-time delivery rate is 98.5% (85% for the industry). With technology push (CAE computing power boosted by 300%) and process optimization (task parallelism by 80%), lkprototype redefines the speed and quality of product iteration.

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Cart